PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Close up the cmu wall at the Attorneys Room Facing East.jpg Installed sprinkler heads at the 2nd floor Facing West.jpg Installed wood block at Elevator 1,2,3 Facing West.jpg Installed motorized dampers at the 4th floor Facing West.jpg Installed VAV boxes at the 4th floor Facing East.jpg VAV boxes at the 4th floor Facing South.jpg
Previous pageNext page Installed VAV boxes at the 4th floor Facing East
Installed VAV boxes at the 4th floor Facing East